On The 4th,5th & 6th Days of Tiling
On both the 4th and 5th day of tiling Pavlo poured 2 bags of the self-leveling concrete mentioned in this post. This was done to help level out a dip between two joist in the floor so that the tile could be set evenly. This picture …