Frame It!

Frame It!

I know, I know, where have I been? Over two weeks since my last post is just inexcusable! Well, let’s just say we’ve had a lot going on (mostly with the house) and therefore haven’t had a whole lot of time to write. Actually, that’s 

On The 4th,5th & 6th Days of Tiling

On The 4th,5th & 6th Days of Tiling

On both the 4th and 5th day of tiling Pavlo poured 2 bags of the self-leveling concrete mentioned in this post. This was done to help level out a dip between two joist in the floor so that the tile could be set evenly. This picture 

An “Authentic” Footstool

An “Authentic” Footstool

While we’re in the process of renovating that bathroom that’s going to be the kid’s bathroom, I thought I’d update you on a little purchase I made for the kiddos and their bathroom. That purchase was a simple little footstool that has made a big