On the 3rd Day of Tiling

On the 3rd Day of Tiling

We finished! Well, we sort of finished. All of the tile is set but we still need to grout. We’re holding off grouting until we lay the floor tile because all of it is going to be grouted the same color so we figured we’d just do it all at once. Just makes it a little bit easier.

Anyways, after day 2 we were left with this:

2 walls down, one to go!

And just had this one last wall (and the bullnose tile around the edges) to complete:

The last wall to tackle!

At the end of day 3 we not only finished the field tile of the shower surround:

The third wall with completed field tile.

but we finished setting all the bullnose tile too (curved tile that lines the edge of the field tile giving it a more polished and finished look).

Bullnose tile
3rd wall tiled!
Finished shower surround.
Another shot of completed shower surround.

Now we move onto the floor. First it’s going to be prepped with some self-leveling concrete so Pavlo moved right on into that after finishing the shower surround. This is a crummy, blackberry picture of the self leveling concrete poured in the center of the room. Once poured in the center of the room it starts to disperse itself evenly across the floor. It may take a little bit of maneuvering with a trowel, but not too much.

self leveling concrete put on the bathroom floor. This was when it was initially poured, it has since spread itself out, I just haven’t been back to take any pictures!


Leave a Reply

Your email address will not be published. Required fields are marked *